Ensure a quality digital twin for operations with a validated BIM handover
Contact us
35%
Using accurate digital twins can deliver a 35% increase in maintenance and operation efficiency
Impact business and achieve better results.
Learn moreHighlight relevant data and engage the ultimate recipients (operators) during construction with a simplified progressive handover.
Access BIM and 3D model content within enterprise asset management solutions to increase efficiency, production uptime and revenue.
Streamline complex data and content assignment, capture, validation and review to keep projects on track.
Adhere to BIM standards, such as ISO19650, ISO12006-2 and BuildingSmart IFC, to comply with government requirements.
Many countries require BIM, yet owners accustomed to traditional 2D formats lack the tools and expertise to understand and validate the massive, complex files their EPCs and suppliers provide. Enable efficient, high-quality BIM data file validation.
Huge BIM models cannot be split up, so each engineering team works on a separate, complete model copy. This leads to uncontrolled versions, confusion, wasted time and expensive rework. Enable teams to work on the same BIM model in parallel.
BIM size and complexity means issues like missing IoT connections or mislocated shut-off valves aren’t uncovered until handover to operations at project completion. Analyze BIM content and begin digital twin configuration during project construction.
Operations and maintenance use 2D drawings and procedures to plan and execute their work. When that information is contained in multiple systems, it can take weeks to find the files. Integrate BIM models, files and data with ECM and EAM solutions.
Solve Building Information Modelling challenges with OpenText.
OpenText Consulting Services combines end-to-end solution implementation with comprehensive technology services to help improve systems.